Construction of 482.375m (2X42.68m+8×48.80m) Long P.C Girder Bridge (Hazipur Bridge) Shahid Shiekh Jamal Bridge at 61st km of Patuakhali-Kuakata Road under Patuakhali Road Division During the year 2009-2010.

1. General Overview

  • Bridge Type:
  • Total Length:
  • Width:
  • Number of Lanes:
  • Pedestrian/Bicycle Lane:
  • Intended Use:

2. Structural Design

  • Main Span Length:
  • Deck Material:
  • Tower Height:
  • Cable Arrangement:
  • Piers:

3. Load Capacity

  • Live Load:
  • Maximum Axle Load:
  • Wind Load Resistance:
  • Seismic Resistance:

4. Foundation & Support

  • Foundation Type:
  • Material:
  • Expansion Joints:

5. Safety & Features

  • Crash Barriers:
  • Lighting System:
  • Drainage System:
  • Navigation Clearance:

6. Environmental & Maintenance Considerations

  • Anti-Corrosion Treatment:
  • Inspection Walkways:
  • Noise Reduction:
  • Eco-Friendliness:

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *