Construction of 482.375m (2X42.68m+8×48.80m) Long P.C Girder Bridge (Hazipur Bridge) Shahid Shiekh Jamal Bridge at 61st km of Patuakhali-Kuakata Road under Patuakhali Road Division During the year 2009-2010.



1. General Overview
- Bridge Type:
- Total Length:
- Width:
- Number of Lanes:
- Pedestrian/Bicycle Lane:
- Intended Use:
2. Structural Design
- Main Span Length:
- Deck Material:
- Tower Height:
- Cable Arrangement:
- Piers:
3. Load Capacity
- Live Load:
- Maximum Axle Load:
- Wind Load Resistance:
- Seismic Resistance:
4. Foundation & Support
- Foundation Type:
- Material:
- Expansion Joints:
5. Safety & Features
- Crash Barriers:
- Lighting System:
- Drainage System:
- Navigation Clearance:
6. Environmental & Maintenance Considerations
- Anti-Corrosion Treatment:
- Inspection Walkways:
- Noise Reduction:
- Eco-Friendliness:
Leave a Reply