



1. General Overview
- Project Name: Construction of Flexible Pavement, Road Embankment, Rigid Pavement, Bus Bay, Protective work, RCC Drain, Saucer Drain, Sign Signal & 8 nos RCC Box Culvert at 53th km to 65th km of Bhola(Porantalukderhat)-Borhanuddin-Lalmohon-Charfession-Charmanika Regional Highway (R 890) Under Bhola Road Division during the year 2020-2021
- Total Length:
- Road Type:
- Lane Configuration:
- Lane Width:
- Shoulder Width:
- Design Speed:
- Median Separation:
- Intended Use:
2. Pavement & Surface Design
- Surface Material:
- Base Layer:
- Subbase Layer:
- Drainage System:
- Markings & Signage:
3. Load Capacity & Traffic Flow
- Projected Traffic Volume:
- Axle Load Capacity:
- Weigh Stations:
- Toll Booths:
4. Bridges & Overpasses
- Number of Bridges:
- Overpasses:
- Bridge Type:
- Navigation Clearance:
5. Safety & Features
- Guardrails:
- Emergency Lanes:
- Lighting:
- Speed Monitoring:
- Rest Stops:
6. Environmental & Maintenance Considerations
- Noise Barriers:
- Eco-Friendly Drainage:
- Slope Protection:
- Regular Maintenance:
Leave a Reply