Bhola(Porantalukderhat)-Borhanuddin-Lalmohon-Charfession-Charmanika Regional Highway.

1. General Overview

  • Project Name: Construction of Flexible Pavement, Road Embankment, Rigid Pavement, Bus Bay, Protective work, RCC Drain, Saucer Drain, Sign Signal & 8 nos RCC Box Culvert at 53th km to 65th km of Bhola(Porantalukderhat)-Borhanuddin-Lalmohon-Charfession-Charmanika Regional Highway (R 890) Under Bhola Road Division during the year 2020-2021
  • Total Length: 
  • Road Type: 
  • Lane Configuration: 
  • Lane Width: 
  • Shoulder Width: 
  • Design Speed: 
  • Median Separation: 
  • Intended Use: 

2. Pavement & Surface Design

  • Surface Material: 
  • Base Layer: 
  • Subbase Layer: 
  • Drainage System:
  • Markings & Signage: 

3. Load Capacity & Traffic Flow

  • Projected Traffic Volume: 
  • Axle Load Capacity: 
  • Weigh Stations: 
  • Toll Booths: 

4. Bridges & Overpasses

  • Number of Bridges:
  • Overpasses: 
  • Bridge Type: 
  • Navigation Clearance: 

5. Safety & Features

  • Guardrails: 
  • Emergency Lanes: 
  • Lighting: 
  • Speed Monitoring: 
  • Rest Stops: 

6. Environmental & Maintenance Considerations

  • Noise Barriers: 
  • Eco-Friendly Drainage: 
  • Slope Protection: 
  • Regular Maintenance: 

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *