Construction of 4-Lane Rajapara-Payra Port connecting Road


The 4-Lane Rajapara-Payra Port Connecting Road is a critical, high-capacity infrastructure project designed to link Bangladesh’s third major seaport, Payra Sea Port, directly to the country’s national highway grid. Positioned in the Patuakhali district, this arterial road acts as the logistical lifeline for the rapidly growing industrial zone around the port.
Project Overview & Technical Specifications
- Total Length: 5.6 kilometers.
- Road Profile: Designed as a comprehensive four-lane commercial carriageway to seamlessly support double-decker container haulers and heavy cargo multi-axle trucks.
- Primary Route: It connects the core facilities of the Payra Port Authority (located at Tiakhali, Kalapara Upazila) directly to Rajapara, which intersects with the main regional highway leading up towards Patuakhali city and Barishal.
Strategic Importance & Economic Impact
- Port-to-Highway Integration: Before its construction, the port relied on narrow, single-lane local roads incapable of carrying heavy industrial traffic. This 4-lane upgrade completely resolves the last-mile bottleneck.
- Bypassing Capital Congestion: Alongside mega-projects like the Lebukhali Payra Bridge and the Padma Bridge, this road helps establish a direct, uninterrupted freight pipeline between southern coastal ports and Dhaka.
- Industrial Catalyst: The road directly unlocks logistical viability for massive nearby operations, including the Payra 1320 MW Thermal Power Plant, a proposed economic zone, and upcoming ship-breaking industries in Patuakhali.
Execution & Institutional Framework
- Development Agency: The project was planned and funded under the Ministry of Shipping via the Payra Port Authority (PPA).
- Construction Lead: Due to the complex, marshy terrain of the coastal haor-adjacent region, the task was awarded to the Bangladesh Navy via a direct government purchase arrangement. Private engineering alliances, including local industrial firms like the M.M Group of Companies, were engaged for phased structural work, heavy paving, and drainage embankments.